Translate

Showing posts with label Greenleaf Corona dollhouse kit. Show all posts
Showing posts with label Greenleaf Corona dollhouse kit. Show all posts

Saturday, December 6, 2008

Building The Greenleaf Pierce Attic Day 7-8

Electrical wires from the 2nd floor

This is the wires taped down before I added the floors to the attic. I am doing it the same way I did for the 1st floor. I am feeding the ceiling light wires to the floors above. I will then create a channel and feed them to the outer walls



Now the floors has been laid



The floors are now stained (It's not dry yet)



Stone added to the 3 walls inside


Attic Fireplace

Here Henry is putting away his tools that are scattered all over the floor (He is a sloppy worker)




Please View The Pierce Building Blog Day 9