Electrical wires from the 2nd floor
This is the wires taped down before I added the floors to the attic. I am doing it the same way I did for the 1st floor. I am feeding the ceiling light wires to the floors above. I will then create a channel and feed them to the outer walls
Now the floors has been laid
The floors are now stained (It's not dry yet)
Stone added to the 3 walls inside
Attic Fireplace
Here Henry is putting away his tools that are scattered all over the floor (He is a sloppy worker)
Please View The Pierce Building Blog Day 9
This is the wires taped down before I added the floors to the attic. I am doing it the same way I did for the 1st floor. I am feeding the ceiling light wires to the floors above. I will then create a channel and feed them to the outer walls
Now the floors has been laid
The floors are now stained (It's not dry yet)
Stone added to the 3 walls inside
Attic Fireplace
Here Henry is putting away his tools that are scattered all over the floor (He is a sloppy worker)
Please View The Pierce Building Blog Day 9