Saturday, December 6, 2008

Building The Greenleaf Pierce Attic Day 7-8

Electrical wires from the 2nd floor

This is the wires taped down before I added the floors to the attic. I am doing it the same way I did for the 1st floor. I am feeding the ceiling light wires to the floors above. I will then create a channel and feed them to the outer walls

Now the floors has been laid

The floors are now stained (It's not dry yet)

Stone added to the 3 walls inside

Attic Fireplace

Here Henry is putting away his tools that are scattered all over the floor (He is a sloppy worker)

Please View The Pierce Building Blog Day 9 

No comments: